Jiri Rezac Photography

  • About
  • Portfolio
    • People
    • Places
    • Industry
    • Creative
  • Stories
    • Tuna Trail
    • Alberta Oilsands
    • Green Tech
    • Antarctic Adventures
    • Shipbreakers of Chittagong
    • The Huntsman
    • Romania Bear Rescue
    • Sirajganj Weavers
    • Lofoten Cod
    • Gas Sector
    • Hastings Fishermen
    • Kawran Bazaar
  • Travel
    • Namibia
    • Arctic Norway
    • Lisboa
    • New Zealand
    • Burma
    • Kurdish Turkey
    • Fjallbacka
    • Malta
  • Projects
    • Empty London
    • Victorian Cemeteries
    • Barbican Estate
    • Underground
    • Bangladesh Daily Life
  • Archive
  • Blog
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 130 images found }

Loading ()...

  • POLAND KRAKOW OCT10 - A statue of Jesus underneath a custom-made roof on a facade in central Krakow, Poland.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2010
    PL10-001.jpg
  • POLAND KRAKOW OCT10 - A statue of Jesus underneath a custom-made roof on a facade in central Krakow, Poland.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2010
    PL10-002.jpg
  • UK ENGLAND LONDON 27FEB09 - Polish plumber Andrzej (surname withheld) fixes a radiator leak in a house in Tooting, south London. Due to the worsening economic situation in Britain and the resultant lack of work, he will return home to Poland next month ..jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Polish_Plumber08.jpg
  • UK ENGLAND LONDON 27FEB09 - Polish plumber Andrzej (surname withheld) fixes a radiator leak in a house in Tooting, south London. Due to the worsening economic situation in Britain and the resultant lack of work, he will return home to Poland next month ..jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Polish_Plumber07.jpg
  • UK ENGLAND LONDON 27FEB09 - Polish plumber Andrzej (surname withheld) fixes a radiator leak in a house in Tooting, south London. Due to the worsening economic situation in Britain and the resultant lack of work, he will return home to Poland next month ..jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Polish_Plumber06.jpg
  • UK ENGLAND LONDON 27FEB09 - Polish plumber Andrzej (surname withheld) fixes a radiator leak in a house in Tooting, south London. Due to the worsening economic situation in Britain and the resultant lack of work, he will return home to Poland next month ..jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Polish_Plumber03.jpg
  • UK ENGLAND LONDON 27FEB09 - Polish plumber Andrzej (surname withheld) fixes a radiator leak in a house in Tooting, south London. Due to the worsening economic situation in Britain and the resultant lack of work, he will return home to Poland next month ..jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Polish_Plumber01.jpg
  • UK ENGLAND LONDON 27FEB09 - Polish plumber Andrzej (surname withheld) fixes a radiator leak in a house in Tooting, south London. Due to the worsening economic situation in Britain and the resultant lack of work, he will return home to Poland next month ..jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Polish_Plumber05.jpg
  • UK ENGLAND LONDON 27FEB09 - Polish plumber Andrzej (surname withheld) fixes a radiator leak in a house in Tooting, south London. Due to the worsening economic situation in Britain and the resultant lack of work, he will return home to Poland next month ..jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Polish_Plumber04.jpg
  • UK ENGLAND LONDON 27FEB09 - Polish plumber Andrzej (surname withheld) fixes a radiator leak in a house in Tooting, south London. Due to the worsening economic situation in Britain and the resultant lack of work, he will return home to Poland next month ..jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Polish_Plumber02.jpg
  • POLAND AUSCHWITZ AUG96 - The 'Torture Block' at Auschwitz camp I.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-034.JPG
  • POLAND AUSCHWITZ AUG96 - The commemoration wall at Auschwitz camp I, where the Nazis used to execute their prisoners.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-033.JPG
  • POLAND AUSCHWITZ AUG96 - A pile of schoes belonging to murdered Auschwitz prisoners.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-028.JPG
  • POLAND AUSCHWITZ AUG96 - Gate to former torture chamber at Auschwitz camp I.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-029.JPG
  • POLAND AUSCHWITZ AUG96 - An empty barrack for Auschwitz prisoners.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-027.JPG
  • POLAND AUSCHWITZ AUG96 - A window at the 'Torture Block' at Auschwitz camp I.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-024.JPG
  • POLAND AUSCHWITZ AUG96 - An empty barrack for Auschwitz prisoners.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-023.JPG
  • POLAND KRAKOW AUG96 - Detail in the yard of the Royal Palace at Krakow.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-022.JPG
  • POLAND KRAKOW AUG96 - A cross commemorates the mass slaughter of Polish military officers at Katyn by Russian forces during WW II.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-021.JPG
  • POLAND KRAKOW AUG96 - Signs and passers-by in Krakow's centre.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-019.JPG
  • POLAND KRAKOW AUG96 - A commemoration plaque celebrating the rebuilding of Krakow in the 1960s.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-018.JPG
  • POLAND KRAKOW AUG96 - Polish naive paintings exhibited at a wall in Krakow's centre.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-016.JPG
  • POLAND KRAKOW AUG96 - Polish naive paintings exhibited at a wall in Krakow's centre.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-017.JPG
  • POLAND WARSAW AUG96 - Mystical bubble-blowers in Warsaw's Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-015.JPG
  • POLAND WARSAW AUG96 - A Pepsi umbrella in Warsaw's Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-013.JPG
  • POLAND WARSAW AUG96 - Advertisement for Pagers and modern telecommunications in Warsaw's Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-012.JPG
  • POLAND WARSAW AUG96 - Mystical bubble-blower in Warsaw's Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-014.JPG
  • POLAND WARSAW AUG96 - A view of Warsaw's rebuilt Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-010.JPG
  • POLAND WARSAW AUG96 - A gypy boy plays the accordeon in Warsaw's rebuilt Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-007.JPG
  • POLAND WARSAW AUG96 - Paintings on display for tourists at Warsaw's Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-008.JPG
  • POLAND WARSAW AUG96 - A view of Warsaw's rebuilt Old Town, with a horse-drawn card waiting for passengers.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-009.JPG
  • POLAND WARSAW AUG96 - Outside view of Warsaw's Palace of Culture, a monument dating back to Stalinist times and architecture of the 1950s.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-004.JPG
  • POLAND WARSAW AUG96 - A tram zooms past in Warsaw's modern city centre, built according to Functionalist principles after its near-total destruction after WW II.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-001.JPG
  • POLAND AUSCHWITZ AUG96 - View into a barracks yard at Auschwitz camp I.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-032.JPG
  • POLAND AUSCHWITZ AUG96 - Entry gate to Auschwitz camp II, the extermination camp.  <br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-031.JPG
  • POLAND AUSCHWITZ AUG96 - Entry gate to Auschwitz camp II, the extermination camp.  <br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-030.JPG
  • POLAND AUSCHWITZ AUG96 - Barbed wire and barracks at Auschwitz camp I.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-026.JPG
  • POLAND AUSCHWITZ AUG96 - The surgical department at Auschwitz camp I, where Nazis carried out medical experminent on live human samples.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-025.JPG
  • POLAND KRAKOW AUG96 - Bridge across the river Wisla, Most Pilsodskiego.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-020.JPG
  • POLAND WARSAW AUG96 - Mystical bubble-blowers in Warsaw's Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-011.JPG
  • POLAND WARSAW AUG96 - A sign of the Queen's Casino above a Stalinist sculpture at the Palace of Culture.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-005.JPG
  • POLAND WARSAW AUG96 - A view of Warsaw's rebuilt Old Town.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-006.JPG
  • POLAND WARSAW AUG96 - A tram zooms past in Warsaw's modern city centre, built according to Functionalist principles after its near-total destruction after WW II.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-002.JPG
  • POLAND WARSAW AUG96 - Evening traffic in Warsaw's modern city centre, built according to Functionalist principles after its near-total destruction after WW II.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 1996<br />
<br />
Tel:   +44 (0) 7050 110 417<br />
Email: info@jirirezac.com<br />
Web:   www.jirirezac.com
    PL96-003.JPG
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-080.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-078.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-077.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-076.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-075.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-074.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-071.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-070.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-079.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-073.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-072.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-069.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin09.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin08.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin07.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin04.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin01.jpg
  • IRELAND LIMERICK 9FEB09 - Flextronics employee James Houlihan in the Raheen Industrial Park and seat of Dell Computers in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, Houlihan and thousands of other workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    James_Houlihan05.jpg
  • IRELAND LIMERICK 9FEB09 - Flextronics employee James Houlihan in the Raheen Industrial Park and seat of Dell Computers in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, Houlihan and thousands of other workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    James_Houlihan04.jpg
  • IRELAND LIMERICK 9FEB09 - Flextronics employee James Houlihan in the Raheen Industrial Park and seat of Dell Computers in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, Houlihan and thousands of other workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    James_Houlihan03.jpg
  • IRELAND LIMERICK 9FEB09 - Flextronics employee James Houlihan in the Raheen Industrial Park and seat of Dell Computers in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, Houlihan and thousands of other workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    James_Houlihan01.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin02.jpg
  • IRELAND LIMERICK 9FEB09 - Flextronics employee James Houlihan in the Raheen Industrial Park and seat of Dell Computers in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, Houlihan and thousands of other workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    James_Houlihan01.jpg
  • IRELAND LIMERICK 9FEB09 - Social Services building in Dominick Street in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    IRL09-007.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-111.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-112.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-110.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-109.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-108.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-106.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-105.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-104.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-101.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-112.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-111.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-110.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-109.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-108.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-107.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-106.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-103.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-102.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin06.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin05.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin03.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin02.jpg
  • IRELAND LIMERICK 9FEB09 - Flextronics employee James Houlihan in the Raheen Industrial Park and seat of Dell Computers in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, Houlihan and thousands of other workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    James_Houlihan06.jpg
  • IRELAND LIMERICK 9FEB09 - Flextronics employee James Houlihan in the Raheen Industrial Park and seat of Dell Computers in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, Houlihan and thousands of other workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    James_Houlihan02.jpg
  • IRELAND LIMERICK 9FEB09 - Social Services building in Dominick Street in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    IRL09-007.jpg
  • IRELAND NEWCASTLEWEST 9FEB09 - Sectoral organiser Karan O'Loughlin of the SIPTU union at an industrial estate in Newcastlewest near Limerick, western Ireland. Due to Dell's decision to relocate to Poland, thousands of workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    Karan_O'Loughlin01.jpg
  • IRELAND LIMERICK 9FEB09 - Flextronics employee James Houlihan in the Raheen Industrial Park and seat of Dell Computers in Limerick, western Ireland. Due to Dell's decision to relocate to Poland, Houlihan and thousands of other workers from Dell and its suppliers face unemployment by the end of 2009...jre/Photo by Jiri Rezac..© Jiri Rezac 2009
    James_Houlihan05.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-107.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-103.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-102.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-105.jpg
  • UK ENGLAND LONDON 28FEB06 - View of the Gillette Building at Gilette Corner in Isleworth, West London. Procter & Gamble, which mergerd with Gillette early in 2005, are to shut the manufacturing facility down by the spring of 2006 and relocate to Poland for the benefit of lower labour costs and higher profits. Apart from about 1000 job cuts, the prominently located factory in West London, Gillette Corner has been sold to Bonnington Investments and Developments Ltd., a London-based hotel company and real estate developer...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-104.jpg
Next