Jiri Rezac Photography

  • About
  • Portfolio
    • People
    • Places
    • Industry
    • Creative
  • Stories
    • Tuna Trail
    • Alberta Oilsands
    • Green Tech
    • Antarctic Adventures
    • Shipbreakers of Chittagong
    • The Huntsman
    • Romania Bear Rescue
    • Sirajganj Weavers
    • Lofoten Cod
    • Gas Sector
    • Hastings Fishermen
    • Kawran Bazaar
  • Travel
    • Namibia
    • Arctic Norway
    • Lisboa
    • New Zealand
    • Burma
    • Kurdish Turkey
    • Fjallbacka
    • Malta
  • Projects
    • Empty London
    • Victorian Cemeteries
    • Barbican Estate
    • Underground
    • Bangladesh Daily Life
  • Archive
  • Blog
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 134 images found }

Loading ()...

  • UK ENGLAND LONDON 20APR15 - Detail view of my neighbourhood in Maida Vale on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2015
    GB15-524.jpg
  • UK ENGLAND LONDON 20APR15 - Detail view of my neighbourhood in Maida Vale on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2015
    GB15-525.jpg
  • UK ENGLAND LONDON 20APR15 - Detail view of the Olympic Stadium and Village on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-309.jpg
  • UK ENGLAND LONDON 20APR15 - New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-307.jpg
  • UK ENGLAND LONDON 20APR15 - Detail view of the Shard on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-308.jpg
  • UK ENGLAND LONDON 20APR15 - Detail view of the Millennium Dome and Docklands Isle of Dogs development on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-306.jpg
  • UK ENGLAND LONDON 20APR15 - Detail view of the Docklands Isle of Dogs development on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-304.jpg
  • UK ENGLAND LONDON 20APR15 - Detail view of the Docklands Isle of Dogs development on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-303.jpg
  • UK ENGLAND LONDON 20APR15 - Detail view of the Docklands Isle of Dogs development on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-305.jpg
  • UK ENGLAND LONDON 20APR15 - New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-302.jpg
  • UK ENGLAND LONDON 20APR15 - Detail view of the Battersea Power Station development on the New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-301.jpg
  • UK ENGLAND LONDON 20APR15 - New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-300.jpg
  • UK ENGLAND LONDON 20APR15 - New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-296.jpg
  • UK ENGLAND LONDON 20APR15 - New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-297.jpg
  • UK ENGLAND LONDON 20APR15 - New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-298.jpg
  • UK ENGLAND LONDON 20APR15 - New London Architecture scale model of all built and approved buildings in London on display in The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    GB15-299.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray04.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray12.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray11.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray10.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray09.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray07.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray08.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray06.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray05.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray03.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray02.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray01.jpg
  • UK ENGLAND LONDON 20APR15 - Peter Murray, Chairman of New London Architecture during an interview at The Building Centre, central London.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2015
    Peter_Murray13.jpg
  • UK ENGLAND LONDON 1JUN10 - Tesco Modec electric delivery vans at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-177.jpg
  • UK ENGLAND LONDON 1JUN10 - Tesco Modec electric delivery vans at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-183.jpg
  • UK ENGLAND LONDON 1JUN10 - Tesco Modec electric delivery vans at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-184.jpg
  • UK ENGLAND LONDON 1JUN10 - Detail of the power socket of a Tesco Modec electric delivery van at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-188.jpg
  • UK ENGLAND LONDON 1JUN10 - Customer Delivery Assitant Colin Smythe drives a Tesco Modec electric delivery van at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-187.jpg
  • UK ENGLAND LONDON 1JUN10 - Tesco Modec electric delivery vans at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-178.jpg
  • UK ENGLAND LONDON 1JUN10 - Tesco Modec electric delivery vans at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-179.jpg
  • UK ENGLAND LONDON 1JUN10 - Tesco Modec electric delivery vans at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-181.jpg
  • UK ENGLAND LONDON 1JUN10 - Detail of the instruments of a Tesco Modec electric delivery van at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-186.jpg
  • UK ENGLAND LONDON 1JUN10 - Tesco Modec electric delivery vans at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-182.jpg
  • UK ENGLAND LONDON 1JUN10 - Detail of the instruments of a Tesco Modec electric delivery van at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-185.jpg
  • UK ENGLAND LONDON 1JUN10 - Detail of a Tesco Modec electric delivery van at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-190.jpg
  • UK ENGLAND LONDON 1JUN10 - Detail of a Tesco Modec electric delivery van at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-189.jpg
  • UK ENGLAND LONDON 1JUN10 - Tesco Modec electric delivery vans at the Bow retail store in East London. The Bow store operates a small fleet of 8 electric vans however Tesco plans to replace all current diesel vans with electric vehicles in the coming year...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-180.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-328.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-294.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Workers install solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid.<br />
<br />
jre/Photo by Jiri Rezac / The Climate Group<br />
<br />
© Jiri Rezac 2010
    Industry03.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-331.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-335.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-332.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-336.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-334.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-321.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - General view of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-339.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-322.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-324.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-326.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-325.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-329.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-327.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-312.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-311.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-313.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-330.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-314.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-315.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-316.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-317.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-319.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-318.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-302.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-320.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-301.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-305.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-303.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-304.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-307.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-310.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-306.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-308.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-292.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-293.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-295.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-299.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-300.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-291.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Construction site of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-112.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Construction site of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-113.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Construction site of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-110.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Construction site of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-111.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Construction site of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-108.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Construction site of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-109.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Workers install solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac / The Climate Group..© Jiri Rezac 2010
    Jiri_Rezac_HCP10_CN.jpg
  • UNITED KINGDOM SIPSON 15JAN09 - Local residents group together in protest to the planned third Heathrow runway projecat at a plot of land in Sipson...jre/Photo by Jiri Rezac / GREENPEACE
    Sipson15JAN09_11.jpg
  • UNITED KINGDOM SIPSON 15JAN09 - Greenpeace activists do a little bit of gardening at a plot of land in Sipson near Heathrow airport, site of the planned third runway project...jre/Photo by Jiri Rezac / GREENPEACE
    Sipson15JAN09_05.jpg
  • UNITED KINGDOM SIPSON 15JAN09 - Greenpeace activists do a little bit of gardening at a plot of land in Sipson near Heathrow airport, site of the planned third runway project...jre/Photo by Jiri Rezac / GREENPEACE
    Sipson15JAN09_04.jpg
  • UNITED KINGDOM SIPSON 15JAN09 - Greenpeace activists do a little bit of gardening at a plot of land in Sipson near Heathrow airport, site of the planned third runway project...jre/Photo by Jiri Rezac / GREENPEACE
    Sipson15JAN09_01.jpg
  • UK ENGLAND SIPSON 12JAN09 - Plot of land in the village of Sipson bought by Greenpeace coalition opposing the Heathrow Third Runway expansion plans...jre/Photo by Jiri Rezac / GREENPEACE
    Sipson09.jpg
  • UNITED KINGDOM SIPSON 12JAN09 - British comedian Alistair McGowan stands at a plot of land in Sipson near Heathrow airport, site of the planned third runway project...jre/Photo by Jiri Rezac
    Sipson04.jpg
  • UNITED KINGDOM SIPSON 12JAN09 - British comedian Alistair McGowan stands at a plot of land in Sipson near Heathrow airport, site of the planned third runway project...jre/Photo by Jiri Rezac
    Sipson02.jpg
  • CHINA SHANGHAI HONGQIAO 19MAY10 - Installation of solar photovoltaic panels on the roofs of the Hongqiao Passenger Rail Terminal in Shanghai, China. There are a total of 23000 solar panels planned for the CECIC-funded project, each panel with a production capacity of 280 KWh to feed into the electricity grid...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-333.jpg
Next