Jiri Rezac Photography

  • About
  • Portfolio
    • People
    • Places
    • Industry
    • Creative
  • Stories
    • Tuna Trail
    • Alberta Oilsands
    • Green Tech
    • Antarctic Adventures
    • Shipbreakers of Chittagong
    • The Huntsman
    • Romania Bear Rescue
    • Sirajganj Weavers
    • Lofoten Cod
    • Gas Sector
    • Hastings Fishermen
    • Kawran Bazaar
  • Travel
    • Namibia
    • Arctic Norway
    • Lisboa
    • New Zealand
    • Burma
    • Kurdish Turkey
    • Fjallbacka
    • Malta
  • Projects
    • Empty London
    • Victorian Cemeteries
    • Barbican Estate
    • Underground
    • Bangladesh Daily Life
  • Archive
  • Blog
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 1185 images found }

Loading ()...

  • UK ENGLAND LONDON 8DEC09 - Greenpeace project a message onto Big Ben at the Houses of Parliament, Westminster, London...At approximately 3am, on the eve of the government’s pre-budget report, Greenpeace added to the mounting calls to re-evaluate Trident replacement by sending a 100 foot high message to Chancellor Alistair Darling, projected onto Big Ben. The projection reads ‘Darling….Cut the crap’ with an image of a Trident missile with its £97 billion life-time price tag...jre/Photo by Jiri Rezac / Greenpeace
    Darling_cut_the_crap02.jpg
  • UK ENGLAND LONDON 8DEC09 - Greenpeace project a message onto Big Ben at the Houses of Parliament, Westminster, London...At approximately 3am, on the eve of the government’s pre-budget report, Greenpeace added to the mounting calls to re-evaluate Trident replacement by sending a 100 foot high message to Chancellor Alistair Darling, projected onto Big Ben. The projection reads ‘Darling….Cut the crap’ with an image of a Trident missile with its £97 billion life-time price tag...jre/Photo by Jiri Rezac / Greenpeace
    Darling_cut_the_crap01.jpg
  • UK ENGLAND LONDON 8DEC09 - Greenpeace project a message onto Big Ben at the Houses of Parliament, Westminster, London...At approximately 3am, on the eve of the government’s pre-budget report, Greenpeace added to the mounting calls to re-evaluate Trident replacement by sending a 100 foot high message to Chancellor Alistair Darling, projected onto Big Ben. The projection reads ‘Darling….Cut the crap’ with an image of a Trident missile with its £97 billion life-time price tag...jre/Photo by Jiri Rezac / Greenpeace
    Darling_cut_the_crap03.jpg
  • UK ENGLAND LONDON 31JAN20 - Video projection by Led by Donkeys onto Big Ben, Westminster, central London.<br />
<br />
jre/Photo by Jiri Rezac / Led by Donkeys<br />
<br />
© Jiri Rezac 2020
    GB20-001.jpg
  • UK ENGLAND LONDON 31JAN20 - Video projection by Led by Donkeys onto Big Ben, Westminster, central London.<br />
<br />
jre/Photo by Jiri Rezac / Led by Donkeys<br />
<br />
© Jiri Rezac 2020
    GB20-003.jpg
  • UK ENGLAND LONDON 31JAN20 - Video projection by Led by Donkeys onto Big Ben, Westminster, central London.<br />
<br />
jre/Photo by Jiri Rezac / Led by Donkeys<br />
<br />
© Jiri Rezac 2020
    GB20-002.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-080.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-079.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-078.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-077.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-076.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-075.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-074.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-071.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-070.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-073.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-072.jpg
  • SPAIN GALICIA AS PONTES 1OCT08 - A Coruña, Spain, 1 October 2008 – Greenpeace activists projected "Quit Coal,.Save the Climate" in Spanish and in English, onto the cooling towers of the As Ponters coal fired power plant in A Coruña, which consumes 20% of Spanish coal and is one of the most polluting power plants in Europe. The protest comes a week before the European Parliament votes on the EU's climate.package, and the construction of over 50 coal plants in Europe...Greenpeace demands the EU votes for measures to block the construction of coal plants, and cut greenhouse gas emissions by at least 30% by 2020. The protest is part of a 4 month "quit coal" ship tour from Israel to Poland, in the run-up to crucial climate negotiations in Poznan, Poland this December...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2008..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..All images © Jiri Rezac 2008. All rights reserved.
    E08-069.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-091.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-087.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-083.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-081.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-074.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-100.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-098.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-096.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-094.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-091.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-090.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-087.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-082.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-077.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-075.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-074.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-100.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-099.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-098.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-097.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-096.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-095.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-094.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-093.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-092.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-090.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-089.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-088.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-086.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-085.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-084.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-082.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-080.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-079.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-078.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-077.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-076.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-075.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-113.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-099.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-097.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-095.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-092.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-089.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-088.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-086.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-085.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-084.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-083.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-081.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-079.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-078.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-076.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-093.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-080.jpg
  • CHINA HONG KONG 24MAY10 - Margaret Lo measures light intensity at a LED lighting pilot project at Hong Kong's Science and Technology University.<br />
<br />
jre/Photo by Jiri Rezac / The Climate Group<br />
<br />
© Jiri Rezac 2010
    Industry12.jpg
  • UK ENGLAND LONDON 21APR15 - View of the foundations of the Principal Tower project and the London skline from 201 Bishopsgate, Liverpool Street, City of London.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2015
    GB15-346.jpg
  • UK ENGLAND LONDON 21APR15 - View of the foundations of the Principal Tower project and the London skline from 201 Bishopsgate, Liverpool Street, City of London.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2015
    GB15-345.jpg
  • UK ENGLAND LONDON 21APR15 - View of the foundations of the Principal Tower project and the London skline from 201 Bishopsgate, Liverpool Street, City of London.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2015
    GB15-343.jpg
  • UK ENGLAND LONDON 21APR15 - View of the foundations of the Principal Tower project and the London skline from 201 Bishopsgate, Liverpool Street, City of London.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2015
    GB15-344.jpg
  • CHINA HONG KONG 24MAY10 - Margaret Lo measures light intensity at a LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-156.jpg
  • CHINA HONG KONG 24MAY10 - Margaret Lo measures light intensity at a LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-154.jpg
  • CHINA HONG KONG 24MAY10 - Margaret Lo measures light intensity at a LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-155.jpg
  • CHINA HONG KONG 24MAY10 - Margaret Lo measures light intensity at a LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-152.jpg
  • CHINA HONG KONG 24MAY10 - Margaret Lo measures light intensity at a LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac / The Climate Group..© Jiri Rezac 2010
    HK10-151.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-149.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-147.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-145.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-142.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-143.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-144.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-141.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-140.jpg
  • CHINA HONG KONG 24MAY10 - Sustainability officer Calvin Lee Kwan checks and waters a grass patch pilot insulation project on a roof at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-133.jpg
  • CHINA HONG KONG 24MAY10 - Sustainability officer Calvin Lee Kwan checks and waters a grass patch pilot insulation project on a roof at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-134.jpg
  • CHINA HONG KONG 24MAY10 - Sustainability officer Calvin Lee Kwan checks and waters a grass patch pilot insulation project on a roof at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-131.jpg
  • CHINA HONG KONG 24MAY10 - Margaret Lo measures light intensity at a LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-157.jpg
  • CHINA HONG KONG 24MAY10 - Margaret Lo measures light intensity at a LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-153.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-150.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-148.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University. Traditional gas-powered light for comparison purposes...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-146.jpg
  • CHINA HONG KONG 24MAY10 - LED lighting pilot project at Hong Kong's Science and Technology University...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    HK10-139.jpg
Next