Jiri Rezac Photography

  • About
  • Portfolio
    • People
    • Places
    • Industry
    • Creative
  • Stories
    • Tuna Trail
    • Alberta Oilsands
    • Green Tech
    • Antarctic Adventures
    • Shipbreakers of Chittagong
    • The Huntsman
    • Romania Bear Rescue
    • Sirajganj Weavers
    • Lofoten Cod
    • Gas Sector
    • Hastings Fishermen
    • Kawran Bazaar
  • Travel
    • Namibia
    • Arctic Norway
    • Lisboa
    • New Zealand
    • Burma
    • Kurdish Turkey
    • Fjallbacka
    • Malta
  • Projects
    • Empty London
    • Victorian Cemeteries
    • Barbican Estate
    • Underground
    • Bangladesh Daily Life
  • Archive
  • Blog
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 1342 images found }

Loading ()...

  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-280.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-291.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-290.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-288.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-289.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-284.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-279.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-278.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-277.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-276.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-275.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-274.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-272.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-273.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-271.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-268.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-270.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-269.jpg
  • CANADA ALBERTA FORT CHIPEWYAN 21JUL09 - Detail view of screen display of the findings of Mike Mercredi's geographical Information Systems data at his office in Fort Chipewyan, northern Alberta, Canada...A trained technician, Mercredi is resposible for the collection and presentation of data that documents the sacred sites, medicinal plants and hunting grounds of the Athabasca Chipewyan First Nation...The tar sand deposits lie under 141,000 square kilometres of sparsely populated boreal forest and muskeg and contain about 1.7 trillion barrels of bitumen in-place, comparable in magnitude to the world's total proven reserves of conventional petroleum. Current projections state that production will  grow from 1.2 million barrels per day (190,000 m³/d) in 2008 to 3.3 million barrels per day (520,000 m³/d) in 2020 which would place Canada among the four or five largest oil-producing countries in the world...The industry has brought wealth and an economic boom to the region but also created an environmental disaster downstream from the Athabasca river, polluting the lakes where water and fish are contaminated. The native Indian tribes of the Mikisew, Cree, Dene and other smaller First Nations are seeing their natural habitat destroyed and are largely powerless to stop or slow down the rapid expansion of the oil sands development, Canada's number one economic driver...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2009
    CA09-419.jpg
  • CANADA ALBERTA FORT CHIPEWYAN 21JUL09 - Mike Mercredi demonstrates the geographical Information Systems data to Greenpeace campaigners Christoph von Lieven and Melina Laboucan-Massimo at his office in Fort Chipewyan, northern Alberta, Canada...A trained technician, Mercredi is resposible for the collection and presentation of data that documents the sacred sites, medicinal plants and hunting grounds of the Athabasca Chipewyan First Nation...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2009
    Mike_Mercredi13.jpg
  • CANADA ALBERTA FORT CHIPEWYAN 21JUL09 - Mike Mercredi demonstrates the geographical Information Systems data to Greenpeace campaigners Christoph von Lieven and Melina Laboucan-Massimo at his office in Fort Chipewyan, northern Alberta, Canada...A trained technician, Mercredi is resposible for the collection and presentation of data that documents the sacred sites, medicinal plants and hunting grounds of the Athabasca Chipewyan First Nation...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2009
    Mike_Mercredi12.jpg
  • CANADA ALBERTA FORT CHIPEWYAN 21JUL09 - Mike Mercredi demonstrates the geographical Information Systems data to Greenpeace campaigners Christoph von Lieven and Melina Laboucan-Massimo at his office in Fort Chipewyan, northern Alberta, Canada...A trained technician, Mercredi is resposible for the collection and presentation of data that documents the sacred sites, medicinal plants and hunting grounds of the Athabasca Chipewyan First Nation...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2009
    Mike_Mercredi11.jpg
  • CANADA ALBERTA FORT CHIPEWYAN 21JUL09 - Mike Mercredi demonstrates the geographical Information Systems data to Greenpeace campaigners Christoph von Lieven and Melina Laboucan-Massimo at his office in Fort Chipewyan, northern Alberta, Canada...A trained technician, Mercredi is resposible for the collection and presentation of data that documents the sacred sites, medicinal plants and hunting grounds of the Athabasca Chipewyan First Nation...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2009
    Mike_Mercredi15.jpg
  • CANADA ALBERTA FORT CHIPEWYAN 21JUL09 - Mike Mercredi demonstrates the geographical Information Systems data to Greenpeace campaigners Christoph von Lieven and Melina Laboucan-Massimo at his office in Fort Chipewyan, northern Alberta, Canada...A trained technician, Mercredi is resposible for the collection and presentation of data that documents the sacred sites, medicinal plants and hunting grounds of the Athabasca Chipewyan First Nation...jre/Photo by Jiri Rezac / GREENPEACE..© Jiri Rezac 2009
    Mike_Mercredi14.jpg
  • UK ENGLAND LONDON 17AUG05 - Lea river in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-292.jpg
  • UK ENGLAND LONDON 17AUG05 - Signs of protest against construction and building works in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-287.jpg
  • UK ENGLAND LONDON 17AUG05 - Banner supporting the Olympic bid in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-286.jpg
  • UK ENGLAND LONDON 17AUG05 - Signs of protest against construction and building works in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-285.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction workers repair a wall in Stratford, surrounding the site of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-282.jpg
  • UK ENGLAND LONDON 17AUG05 - Dumped cars and rubbish litters the Lea river in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-293.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction workers repair a wall in Stratford, surrounding the site of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-283.jpg
  • UK ENGLAND LONDON 17AUG05 -General view of one of the Aquatic Centre, part of the site of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-281.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-027.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-026.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-018.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - A local resident protests at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-010.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-007.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-008.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-004.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-032.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-031.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-029.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-030.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-028.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-024.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police arrest a protester as local residents demonstrate at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-023.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police show a presence as local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-019.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-015.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-014.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police show a presence as local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-012.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-009.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-006.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-005.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-003.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2013
    GB13-013.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police show a presence as local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-025.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police guard lorries exiting and entering the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2013
    GB13-022.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police show a presence as local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-017.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police show a presence as local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-020.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-016.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police show a presence as local residents protest at the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-011.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-001.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - General view of the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
 / GREENPEACE<br />
<br />
© Jiri Rezac 2013
    GB13-002.jpg
  • UK ENGLAND WEST SUSSEX BALCOMBE 26JUL13 - Police guard lorries exiting and entering the Cuadrilla hydraulic fracking drill site in Balcombe, West Sussex.<br />
<br />
Cuadrilla plans to start drilling a 3,000ft (914m) vertical well and a 2,500ft (762m) horizontal bore to the south of the village in search for oil and gas resources.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2013
    GB13-021.jpg
  • UK ENGLAND LONDON 14MAY10 - Builder David Behuncik of Properform Builders lays Rockwool heat and sound insulation underneath floorboards on a building site in north London...Forty per cent of London's CO2 emissions come from energy use in Londoners homes. If all Londoners insulated their homes properly London could save up to 700,000 tonnes of CO2, helping to fight climate change and save the planet...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-143.jpg
  • UK ENGLAND LONDON 14MAY10 - Builder David Behuncik of Properform Builders lays Rockwool heat and sound insulation underneath floorboards on a building site in north London...Forty per cent of London's CO2 emissions come from energy use in Londoners homes. If all Londoners insulated their homes properly London could save up to 700,000 tonnes of CO2, helping to fight climate change and save the planet...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-140.jpg
  • UK ENGLAND LONDON 14MAY10 - Builder David Behuncik of Properform Builders lays Rockwool heat and sound insulation underneath floorboards on a building site in north London...Forty per cent of London's CO2 emissions come from energy use in Londoners homes. If all Londoners insulated their homes properly London could save up to 700,000 tonnes of CO2, helping to fight climate change and save the planet...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-142.jpg
  • UK ENGLAND LONDON 14MAY10 - Builder David Behuncik of Properform Builders lays Rockwool heat and sound insulation underneath floorboards on a building site in north London...Forty per cent of London's CO2 emissions come from energy use in Londoners homes. If all Londoners insulated their homes properly London could save up to 700,000 tonnes of CO2, helping to fight climate change and save the planet...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-141.jpg
  • MALTA TARXIEN 23JUL06 - Maltese flags fly in Tarxien near the site of the Tarxien Neolithic temples, a UNESCO World Heritage site...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com
    M06-180.jpg
  • GERMANY HAMBURG 1SEP13 - Emblem of the  IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-095.jpg
  • GERMANY HAMBURG 1SEP13 - IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-094.jpg
  • GERMANY HAMBURG 1SEP13 - IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-091.jpg
  • GERMANY HAMBURG 1SEP13 - IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-089.jpg
  • GERMANY HAMBURG 1SEP13 - IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-088.jpg
  • GERMANY HAMBURG 1SEP13 - Police cars in front of a building at the IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-087.jpg
  • GERMANY HAMBURG 1SEP13 - Solar house at the IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-085.jpg
  • GERMANY HAMBURG 1SEP13 - Detail of a wooden terrace on display at the IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-084.jpg
  • GERMANY HAMBURG 1SEP13 - IBA architecture and building exhibition site in Wilhelmsburg, Hamburg.<br />
<br />
With HafenCity and the International Building Exhibition IBA, Hamburg is home to two of the most important urban development areas in Europe.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    DE13-082.jpg
  • UK ENGLAND LONDON 18NOV10 - Potential LED street lighting test site at the A40 in Greenford, west London...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-239.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-096.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-091.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-090.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-087.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-083.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-081.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-074.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-100.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-099.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-098.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-096.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-095.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-094.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-091.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-090.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-087.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-082.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-078.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-077.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-075.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-074.jpg
Next