Jiri Rezac Photography

  • About
  • Portfolio
    • People
    • Places
    • Industry
    • Creative
  • Stories
    • Tuna Trail
    • Alberta Oilsands
    • Green Tech
    • Antarctic Adventures
    • Shipbreakers of Chittagong
    • The Huntsman
    • Romania Bear Rescue
    • Sirajganj Weavers
    • Lofoten Cod
    • Gas Sector
    • Hastings Fishermen
    • Kawran Bazaar
  • Travel
    • Namibia
    • Arctic Norway
    • Lisboa
    • New Zealand
    • Burma
    • Kurdish Turkey
    • Fjallbacka
    • Malta
  • Projects
    • Empty London
    • Victorian Cemeteries
    • Barbican Estate
    • Underground
    • Bangladesh Daily Life
  • Archive
  • Blog
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 158 images found }

Loading ()...

  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-103.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-099.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-097.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-094.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-091.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-099.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-102.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-101.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-100.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-098.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-096.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-095.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-093.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-092.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-103.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-097.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-092.jpg
  • UK ENGLAND LONDON 21MAR07 - General view of the finished Wembley National Stadium, built by Australian firm Multiplex. The previous Wembley Stadium (officially the Empire Stadium, but called Wembley due to its location) was arguably the world's most famous football stadium, being England's national stadium for football. In 2002, the original structure was demolished and construction began on the new stadium, originally intended to open in 2006. This was later delayed until early 2007. The final completion date of the stadium came on 9 March 2007, when the keys to the stadium were handed over to The Football Association...jre/Photo by Jiri Rezac..© Jiri Rezac 2007..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2007 - All rights reserved.
    GB07-091.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-091.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-087.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-083.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-074.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-100.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-098.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-096.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-091.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-087.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-082.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-077.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-075.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-100.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-099.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-098.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-097.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-096.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-095.jpg
  • UK ENGLAND LONDON 28FEB06 - Construction workers on the forecourt at the Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-094.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-093.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-092.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-090.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-089.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-088.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-086.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-084.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-082.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-081.jpg
  • UK ENGLAND LONDON 28FEB06 - Detail view of the giant arch above Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-080.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-079.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-078.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-077.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-076.jpg
  • UK ENGLAND LONDON 28FEB06 - General view of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-075.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-113.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-099.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-097.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-095.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-094.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-092.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-090.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-089.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-088.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-086.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-085.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-083.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-081.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-078.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-076.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-074.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-085.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-093.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-084.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-080.jpg
  • UK ENGLAND LONDON 28FEB06 - View of Wembley National Stadium construction site at Wembley, west London. The Wembley stadium reconstruction project, undertaken by Australian contractor Multiplex is running behind schedule and over-budget. The British Football Association has decided to relocate the 2006 FA cup to Cardiff amid fears that the project will not be completed on time...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-079.jpg
  • UK ENGLAND LONDON 17AUG05 - Lea river in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-292.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-280.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-291.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-290.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-288.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-289.jpg
  • UK ENGLAND LONDON 17AUG05 - Signs of protest against construction and building works in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-287.jpg
  • UK ENGLAND LONDON 17AUG05 - Banner supporting the Olympic bid in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-286.jpg
  • UK ENGLAND LONDON 17AUG05 - Signs of protest against construction and building works in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-285.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-284.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction workers repair a wall in Stratford, surrounding the site of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-282.jpg
  • UK ENGLAND LONDON 17AUG05 -General view of one of the Aquatic Centre, part of the site of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-281.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-279.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-278.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-277.jpg
  • UK ENGLAND LONDON 17AUG05 - Street scene in Stratford and the Lee Valley, sites to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-276.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-275.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-274.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-272.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-273.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-271.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-268.jpg
  • UK ENGLAND LONDON 17AUG05 - Dumped cars and rubbish litters the Lea river in Stratford, site to the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-293.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction workers repair a wall in Stratford, surrounding the site of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-283.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-270.jpg
  • UK ENGLAND LONDON 17AUG05 - Construction for the international train station in Stratford, part of the Channel Tunnel Rail Link due to be completed by 2007. Stratford is also one of the major sites of the planned Olympic Stadium and Village for the 2012 London Olympic Games. Winning the bid against rival Paris, the London Games are expected to return a £ 100 million surplus to the IOC and British sport...jre/Photo by Jiri Rezac ..© Jiri Rezac 2005..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2005 - All rights reserved.
    GB05-269.jpg
  • UK ENGLAND WIGAN 9FEB10 - Miss England, Katrina Hodge (22) attends the football match between Premier League clubs Wigan and Stoke City at the VIP section of the Wigan Football stadium. Katrina Hodge is on a week-long tour to promote the beauty pageant and careers at the armed forces in northern England...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    Miss_England29.jpg
Next