Jiri Rezac Photography

  • About
  • Portfolio
    • People
    • Places
    • Industry
    • Creative
  • Stories
    • Tuna Trail
    • Alberta Oilsands
    • Green Tech
    • Antarctic Adventures
    • Shipbreakers of Chittagong
    • The Huntsman
    • Romania Bear Rescue
    • Sirajganj Weavers
    • Lofoten Cod
    • Gas Sector
    • Hastings Fishermen
    • Kawran Bazaar
  • Travel
    • Namibia
    • Arctic Norway
    • Lisboa
    • New Zealand
    • Burma
    • Kurdish Turkey
    • Fjallbacka
    • Malta
  • Projects
    • Empty London
    • Victorian Cemeteries
    • Barbican Estate
    • Underground
    • Bangladesh Daily Life
  • Archive
  • Blog
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 166 images found }

Loading ()...

  • UK ENGLAND SOUTH COAST 12MAY11 - Offshore wind turbine park on the coast of the United Kingdom, seen from aboard a ship in the English Channel...Photo by Jiri Rezac
    GB11-153.jpg
  • UK ENGLAND SOUTH COAST 12MAY11 - Offshore wind turbine park on the coast of the United Kingdom, seen from aboard a ship in the English Channel...Photo by Jiri Rezac
    GB11-154.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Detail view of a wind turbine during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-123.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Detail view of a wind turbine during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-124.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Detail view of a wind turbine during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-122.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Detail view of a wind turbine during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-121.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-275.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-273.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-278.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-272.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Tidal Transit vessel crew transfer a load onto a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-266.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayme Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-260.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew and engineers get ready to transfer to a wind turbine from the bow of the Tidal Transit vessel Tia Elizabeth at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-259.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-280.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-277.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-279.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-276.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew and engineers get ready to transfer to a wind turbine from the bow of the Tidal Transit vessel Tia Elizabeth at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-270.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew and engineers get ready to transfer to a wind turbine from the bow of the Tidal Transit vessel Tia Elizabeth at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-269.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Tidal Transit vessel crew transfer a load onto a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-268.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Inspection engineers climb onto a wind turbine from the bow of the Tidal Transit vessel Tia Elizabeth at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2013
    GB13-264.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew and engineers get ready to transfer to a wind turbine from the bow of the Tidal Transit vessel Tia Elizabeth at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-281.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-274.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Tidal Transit vessel crew transfer a load onto a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-267.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Inspection engineers climb onto a wind turbine from the bow of the Tidal Transit vessel Tia Elizabeth at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2013
    GB13-262.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Crew member Wayne Gascogne  (L) gets ready to transfer inspection engineers from the bow of the Tidal Transit vessel Tia Elizabeth to a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-271.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Tidal Transit vessel crew transfer a load onto a wind turbine at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-265.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Inspection engineers climb onto a wind turbine from the bow of the Tidal Transit vessel Tia Elizabeth at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2013
    GB13-263.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - Inspection engineers climb onto a wind turbine from the bow of the Tidal Transit vessel Tia Elizabeth at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
© Jiri Rezac 2013
    GB13-261.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-446.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-445.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-444.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-448.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-448.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-447.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-446.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-447.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-444.jpg
  • UK ENGLAND CUMBRIA 31MAY06 - Lambrigg Wind Farm near Kendal in the Lake District, northern England..jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-445.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Wind turbines manufactured by Sinovel at the Dong Hai offshore windfarm, about 100 Km southeast of Shanghai. The pilot project is the first of its kind in China and consists of 34 wind turbines each with a capacity of 3 MWh. Sinovel is the largest manufacturer of wind turbines in China and the third largest worldwide...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-342.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Wind turbines manufactured by Sinovel at the Dong Hai offshore windfarm, about 100 Km southeast of Shanghai. The pilot project is the first of its kind in China and consists of 34 wind turbines each with a capacity of 3 MWh. Sinovel is the largest manufacturer of wind turbines in China and the third largest worldwide...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-344.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Wind turbines manufactured by Sinovel at the Dong Hai offshore windfarm, about 100 Km southeast of Shanghai. The pilot project is the first of its kind in China and consists of 34 wind turbines each with a capacity of 3 MWh. Sinovel is the largest manufacturer of wind turbines in China and the third largest worldwide...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-345.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Wind turbines manufactured by Sinovel at the Dong Hai offshore windfarm, about 100 Km southeast of Shanghai. The pilot project is the first of its kind in China and consists of 34 wind turbines each with a capacity of 3 MWh. Sinovel is the largest manufacturer of wind turbines in China and the third largest worldwide...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-340.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Wind turbines manufactured by Sinovel at the Dong Hai offshore windfarm, about 100 Km southeast of Shanghai. The pilot project is the first of its kind in China and consists of 34 wind turbines each with a capacity of 3 MWh. Sinovel is the largest manufacturer of wind turbines in China and the third largest worldwide...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-341.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Wind turbines manufactured by Sinovel at the Dong Hai offshore windfarm, about 100 Km southeast of Shanghai. The pilot project is the first of its kind in China and consists of 34 wind turbines each with a capacity of 3 MWh. Sinovel is the largest manufacturer of wind turbines in China and the third largest worldwide...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-343.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Wind turbines manufactured by Sinovel at the Dong Hai offshore windfarm, about 100 Km southeast of Shanghai. The pilot project is the first of its kind in China and consists of 34 wind turbines each with a capacity of 3 MWh. Sinovel is the largest manufacturer of wind turbines in China and the third largest worldwide...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-346.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Wind turbines manufactured by Sinovel at the Dong Hai offshore windfarm, about 100 Km southeast of Shanghai. The pilot project is the first of its kind in China and consists of 34 wind turbines each with a capacity of 3 MWh. Sinovel is the largest manufacturer of wind turbines in China and the third largest worldwide...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-347.jpg
  • NETHERLANDS AMSTERDAM 11MAY11 - Wind turbines at the port of Amsterdam, Netherlands...Photo by Jiri Rezac
    NL11-015.jpg
  • NETHERLANDS AMSTERDAM 11MAY11 - Wind turbines at the port of Amsterdam, Netherlands...Photo by Jiri Rezac
    NL11-010.jpg
  • UK ENGLAND NORFOLK 30APR06 - Blood Hill windfarm, consisting altogether of 10 turbines. The project was started in 1992 and is one of the first in the UK to utilise renewable energy for electricity production...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-350.jpg
  • UK ENGLAND NORFOLK 30APR06 - Blood Hill windfarm, consisting altogether of 10 turbines. The project was started in 1992 and is one of the first in the UK to utilise renewable energy for electricity production...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-352.jpg
  • UK ENGLAND NORFOLK 30APR06 - Blood Hill windfarm, consisting altogether of 10 turbines. The project was started in 1992 and is one of the first in the UK to utilise renewable energy for electricity production...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-354.jpg
  • UK ENGLAND NORFOLK 30APR06 - Blood Hill windfarm, consisting altogether of 10 turbines. The project was started in 1992 and is one of the first in the UK to utilise renewable energy for electricity production...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-353.jpg
  • UK ENGLAND NORFOLK 30APR06 - Blood Hill windfarm, consisting altogether of 10 turbines. The project was started in 1992 and is one of the first in the UK to utilise renewable energy for electricity production...jre/Photo by Jiri Rezac..© Jiri Rezac 2006..Contact: +44 (0) 7050 110 417.Mobile:  +44 (0) 7801 337 683.Office:  +44 (0) 20 8968 9635..Email:   jiri@jirirezac.com.Web:    www.jirirezac.com..© All images Jiri Rezac 2006 - All rights reserved.
    GB06-351.jpg
  • UK ENGLAND LONDON 14MAY10 - View of the Razor Tower in Elephant & Castle, south London. The 'Razor' is an environmentally innovative new tower block that will boast three wind turbines. ..jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-106.jpg
  • UK ENGLAND LONDON 14MAY10 - View of the Razor Tower in Elephant & Castle, south London. The 'Razor' is an environmentally innovative new tower block that will boast three wind turbines. ..jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-107.jpg
  • UK ENGLAND LONDON 14MAY10 - View of the Razor Tower in Elephant & Castle, south London. The 'Razor' is an environmentally innovative new tower block that will boast three wind turbines. ..jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-104.jpg
  • UK ENGLAND LONDON 14MAY10 - View of the Razor Tower in Elephant & Castle, south London. The 'Razor' is an environmentally innovative new tower block that will boast three wind turbines...jre/Photo by Jiri Rezac / The Climate Group..© Jiri Rezac 2010
    Jiri_Rezac_HCP02_UK.jpg
  • UK ENGLAND LONDON 14MAY10 - View of the Razor Tower in Elephant & Castle, south London. The 'Razor' is an environmentally innovative new tower block that will boast three wind turbines. ..jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-108.jpg
  • UK ENGLAND LONDON 14MAY10 - View of the Razor Tower in Elephant & Castle, south London. The 'Razor' is an environmentally innovative new tower block that will boast three wind turbines. ..jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-105.jpg
  • UK ENGLAND LONDON 14MAY10 - View of the Razor Tower in Elephant & Castle, south London. The 'Razor' is an environmentally innovative new tower block that will boast three wind turbines. ..jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    GB10-103.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Traffic on Dong Hai bridge, leading to the busy offshore container terminal servicing most of China's export industries...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-115.jpg
  • CHINA PUDONG DISTRICT DONG HAI 22MAY10 - Traffic on Dong Hai bridge, leading to the busy offshore container terminal servicing most of China's export industries...jre/Photo by Jiri Rezac..© Jiri Rezac 2010
    CN10-114.jpg
  • CHINA SHANGHAI PUDONG 22MAY10 - Shanghai World Financial Centre and Jinmao Tower in Pudong, Shanghai during a spell of haze and rain in the city.jre/Photo by Jiri Rezac© Jiri Rezac 2010
    CN10-043.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-099.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-120.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-119.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-118.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-117.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-116.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-115.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-113.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-112.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-109.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-107.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-106.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-105.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-104.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-103.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-102.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-101.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-114.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-111.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-110.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-108.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of wind turbines during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-100.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of a sub-station during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-126.jpg
  • UK ENGLAND NORFOLK SHERINGHAM SHOAL 25SEP13 - General view of a sub-station during a misty day at the Sheringham Shoal wind farm in the North Sea off the Norfolk coast, England.<br />
<br />
Operated by Scira, the wind farm consists of 88 Siemens 3.6 MW wind turbines (model SWT-3.6-107 costing €450m ($597m)), giving a total combined nameplate capacity of 317 MW.<br />
<br />
<br />
<br />
jre/Photo by Jiri Rezac<br />
<br />
<br />
<br />
© Jiri Rezac 2013
    GB13-125.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8725.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8668.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8779.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8772.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8777.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8757.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8740.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8700.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8672.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8670.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8664.jpg
  • UK ENGLAND GREENFIELD 21MAR12 - Abseiling and inspection of wind turbine blade training at Capital Safety training facility in Greenfield, Greater Manchester...jre/Photo by Jiri Rezac..© Jiri Rezac 2012
    210312_8646.jpg
Next